Skip to content
ZENITH

Portfolio / Warehousing

Logistics Hub A

Available

Metro East. High-cube logistics hub built for automated pick-pack facilities, minutes from the expressway.

Main photo (temporary stock photo)
Main photo
Photo (temporary stock photo)
Photo
Photo (temporary stock photo)
Photo
Drone (temporary stock photo)
Drone
Floor plan (temporary stock photo)
Floor plan

Specifications

Gross floor area12,000 sqm
Clear height12 m
Floor loading5 t/sqm
Dock doors24 with levellers
Power2 MVA, expandable
Automation-readyYes, pick-pack layout
AvailabilityImmediate

Illustrative figures until confirmed by Zenith.

On-site ecosystem services

  • ShipHub fulfillment operations available
  • ThermaNode heat recovery bays: 2
  • TapLocal merchant hub zone

Enquire about this property

Brochure and floor plans are available on request through this form.

Back to portfolio