Modular data center hosting
Capacity grid
Powered shell spaces engineered for high-density compute, direct liquid cooling and ThermaNode units. Figures are illustrative until confirmed.
- 8 MW
- Total power
- 6.3 MW
- Available now or in development
- 3
- DLC-ready halls
- 15
- ThermaNode bays
across all sites
heat recovery integrated
DC Shell 1
AvailableIndustrial corridor, 4 MW, Direct liquid, 8 ThermaNode bays
5 / 24 halls committedQ4 2026
Reserve capacityIndustrial Shell 2
AvailableIndustrial corridor, 2.5 MW, Air, DLC option, 4 ThermaNode bays
8 / 24 halls committedNow
Reserve capacityEdge Hall A
In developmentMetro East, 1 MW, Direct liquid, 2 ThermaNode bays
0 / 24 halls committedQ2 2027
Join waitlistCampus Edge
In developmentMetro Central, 0.5 MW, Air, 1 ThermaNode bay
0 / 24 halls committedQ2 2027
Join waitlist- Committed
- Available
- Reserved
- Future phase
Table view
Site by site
| Site | Region | Total power | Available | Cooling | ThermaNode | Density | Ready | Status |
|---|---|---|---|---|---|---|---|---|
| DC Shell 1 | Industrial corridor | 4 MW | 3.2 MW | Direct liquid | 8 bays | up to 60 kW per rack | Q4 2026 | Available |
| Industrial Shell 2 | Industrial corridor | 2.5 MW | 1.6 MW | Air, DLC option | 4 bays | up to 30 kW per rack | Now | Available |
| Edge Hall A | Metro East | 1 MW | 1 MW | Direct liquid | 2 bays | up to 60 kW per rack | Q2 2027 | In development |
| Campus Edge | Metro Central | 0.5 MW | 0.5 MW | Air | 1 bays | up to 15 kW per rack | Q2 2027 | In development |
Engineered with ThermaNode
Heat recovery built into the shell.
Every hall is designed around direct liquid cooling loops that feed ThermaNode heat recovery units, lowering tenant energy cost and PUE.